HOFSTADTER & ASSOCIATES, INC.

   Civil / Environmental / Transportation Consulting Engineers 

4571 Arkwright Road
Macon, GA. 31210
478-757-1169
478-471-1646 (fax)

The Macon Water Authority

790 Second Street

Macon, Georgia 31202

 

***ADDENDUM NO. 3*** Issued April 1, 2010 - Bid Date Change

 

The Bid Opening for the Macon Water Authority, Ruben Drive Pump Station, Water System Improvements has been

 RE-SCHEDULED from April 6, 2010 at 2:00 P.M. to Wednesday, April 14, 2010 at 2:00 P.M.

***ADDENDUM NO. 2*** Issued March 30, 2010 (85 pages)

 

***ADDENDUM NO. 1*** Issued March 23, 2010

 

INVITATION TO BID - WATER SYSTEM IMPROVEMENTS, RUBEN PUMP STATION

MACON WATER AUTHORITY

MACON, GEORGIA

Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the construction of the Water System Improvements, Ruben Drive Pump Station will be received by the Owner at 790 Second Street, Second Floor Board Room, Macon, Georgia 31202 until 2:00 PM, local time, on _March 23, 2010__, and then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid meeting at the same location at _10:30 AM__, local time, on _March 9, 2010. All bid questions must be submitted to the Engineer by March 16, 2010.

The project consists of the rehabilitation of an existing water pumping station, including building addition, roof repairs, new electrical service, replacement of three (3) booster pumps, upgrades to SCADA system, replacement chlorine system, demolition of miscellaneous electrical equipment, restroom construction, and miscellaneous items.

The work will be awarded in one Contract. Fifty-one percent (51%) of the bid price must be completed by the General Contractor. The work will be awarded on the basis of the total sum bid for the construction of all utilities and associated work noted on the Drawings.

The Instructions to Bidders, Contract Agreement, Drawings, Specifications and forms of Bid Bond, Performance Bond, and Payment Bond and other Contract Documents may be examined by contacting Randy Smith at the following:

Engineering Division

Macon Water Authority

790 Second Street

Macon, GA 31202-0108

Telephone 478-464-5642

Copies of Contract Documents may be obtained at the office of :

Hofstadter and Associates, Inc.

4571 Arkwright Road

Macon, Georgia 31210

478-757-1169

478-471-1646 (fax)

upon payment of $150.00, non-refundable, for each set. Street address must be provided to ensure prompt delivery. No partial sets of bidding documents shall be issued by the Engineer.

Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond attached to the Contract Documents, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570, in the amount of 10% of the Bid.

Bidders must comply with the Minority Participation Requirements specified in the Instructions to Bidders.

The Bidder shall affix to the outside of its bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility Manager nor a subcontractor’s Georgia Utility Contractor License Number.

The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 % of the Bid.

Employment of Local Businesses and Contractors: It is the wish of the Owner that local businesses, including minorities and disadvantaged subcontractors, be given the opportunity to bid on the various parts of the work.

The desire on the part of the Owner to encourage participation of minority and locally owned businesses and contractors is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Owner supports a healthy, free market system that seeks to include responsible local businesses and provide ample opportunities for local business growth and development.

The Owner reserves the right to reject any or all Bids, to waive informalities, and to re-advertise.

The Macon Water Authority

R.A. "Tony" Rojas

Executive Director

 

Project Engineer: John Fry

Project Cost Estimate: $ 1 Million

Cost of Plans & Specifications: $150.00per set, non-refundable

The Macon Water Authority -  "Water System Improvements,  Ruben Pump Station" - Plan Holder's List:
* The Macon Water Authority
*Shawn Wood - Hofstadter & Assoc - Construction Observation
 
Plan Rooms:
* McGraw Hill Construction Dodge Report - Marietta
* McGraw Hill Construction Dodge Report- Columbus
* McGraw Hill Construction Dodge Report - Tallahassee
*Reed Construction Data - 30 Technology Pkwy South, Suite 500 - Norcross, GA 30092  (770-849-6426 / 800-303-8629 fax)
*GA Branch, AGC & SqFt - 1940 The Exchange, Suite 300 - Atlanta, GA 30339 (800-364-2059 / 866-570-8187 fax)
 
Plan Holders:
*Sam Hall and Sons, Inc. - 5431 Tinker Drive - Macon, GA 31204 (478-788-1108 fax)
*Heavy Constructors, Inc. - 1596 Lower Rorwell Road - Marietta, Ga 30068 (770-321-8860 fax)
*R.T.D. Construction, Inc. - 5344 9th Street - Zephyrhills, FL 33542 (813-783-9919 / 813-783-9333 fax)
*W.F. Floyd Construction, Inc. - 125 Clairemont Avenue, Suite 510 - Decatur, GA 30030 (404-687-2800 / 404-377-4692 fax)
*Allsouth Constructors, Inc. - 9124 North Park Drive - Covington, GA 30014 (770-788-8703 fax)
*Rehab Construction Co., Inc. - 2246 Bethel Road - Conyers, GA 30012 (770-922-0806 / 770-922-0507 fax)
American Cast Iron Pipe Co. - 2916 16th Street, North - Birmingham, AL 35207 (205-325-8022 / 800-442-2348 fax)
Rockdale Pipeline, Inc. - 1925 Old Covington Hwy - P.O. Box 1157 - Conyers, GA 30013 (770-922-4123 / 770-483-2562 fax)
M/R System, Inc. - 1185 Beaver Ruin Road, Suite A - Norcross, GA 30093
C&B Piping, Inc. - 8804 Parkway Drive - Leeds, AL 35094 (205-699-0455 / 205-702-7041 fax)
Pyles Plumbing & Utilities Contractors, Inc. - 835 Hillcrest Industrial Blvd - Macon, GA 31204 (478-746-0264 / 478-738-0056 fax)